Skip to Main Content
ARIS - SHARE YOUR IDEAS
How can we make ARIS better?
ADD A NEW IDEA

Pinned ideas

View all
PINNED EMS - Proper management of validity of content
Hi, When implementing a QMS or EMS it's important to have valid content.Therefore customers define validity dates in ARIS and there is now the dashboard which displays this info, but anext requirement is that ARIS actually does something with this...
PINNED AI/ML features integration
like clustering, outliers detection, key influencers, predictive results with classification algorithms this would support Root-Cause-Analysis

All ideas

Showing 1457

Add BPMN modeltypes to report "Analyze times/costs"

The addition of BPMN modeltypes for this specific report, enhances it's usability. Furthermore it enables low maturity companies to be able to 'chalk' their process costs in a cost efficient and easy to understand way for their audience. Currently...
Vincent Bakker 11 days ago in Content Analysis & Reporting 0 Open for voting

Get change list version of a model in the workplace

Sometimes a process has become so "mixed up" that you would like to have the old status (versioned version in change list x) back in the workspace. It would be desirable to be able to do this with analogous options to the merge process. Instead of...
Hubert Warsitz 12 days ago in Modeling & Contribution 0 Open for voting

Synchronization of group structures for multi-database solutions

If you use ARIS with several databases, it would be helpful to have an option to keep the group structures in the different databases synchronized. Starting from a leading database, the groups and their content (if available) are kept synchronized...
Hubert Warsitz 15 days ago in Technical Administration 0 Open for voting

Comparison of documentation attribute content

It would be desirable to be able to compare the content of two (any) documentation attribute versions for the same ARIS artifact (model or object) or for ARIS artifacts that are in a master-variant relationship. Analogous to the currently possible...
Hubert Warsitz 15 days ago in Modeling & Contribution 0 Open for voting

Rest API should also be able to process master-variant relationships

It is currently not possible to use the information of master-variant relationships in the Rest API (search for, evaluate, ...). It would be desirable to be able to process this information with the Rest API as well. [in deutsch] Aktuell ist es in...
Hubert Warsitz 15 days ago in Integration, Connectors & API 0 Open for voting

Include Traditional Chinese characters besides Simplified

Hello, ARIS has different language options, to choose from. One is Chinese, but it uses simplified characters, as used in the people's republic of China. But not everyone country that uses Mandarin Chinese uses those characters; i.e. Taiwan. Tradi...
David Schmidt 15 days ago in Technical Administration 0 Open for voting

Allow symbol edition in ARIS Connect

Symbol edition should be allowed in the Connect environment (ARIS Connect Entreprise), with at least the same features that exist today in ARIS Architect.
Mathieu Syx 17 days ago in Technical Administration 0 Open for voting

Survey management - allow independent responses from ALL interviewees

When a questionnaire is sent out to a group of interviewees, the first complete response marks the task as completed. As long as the questionnaire has not been completed, all users can see the answers provided so far. A Questionnaire Scheduler the...
Jörg Neves Bliesener 19 days ago in Risk & Compliance 0 Open for voting

Avoid Scrolling Through List of Values in Attributes

When using attributes with several drop-down values, users are required to manually scroll through the alphabetical list and then find the value they are searching for. Instead of manual scrolling, is there a way to allow users to be directed to t...
Kavitha Pillai 23 days ago in Modeling & Contribution 0 Open for voting

Risk-Control-Matrix as a standard report in ARCM

Risiko-Kontroll-Matrix The report "Risk-and-Control-Matrix" is a standard requirement for GRC use cases. It is used as a documentation of the business processes with respect to the allocated risks and controls. Auditors (internal and external) use...
Sabine Runge 23 days ago in Risk & Compliance 0 Open for voting