Skip to Main Content
ARIS - SHARE YOUR IDEAS
How can we make ARIS better?
Status Open for voting
Workspace Risk & Compliance
Created by Guest
Created on Mar 22, 2022

Discrepancy between the doc period on ARCM and the PDF/excel extract

On constate un d�calage entre la p�riode de doc / p�riode document�e qui s�affiche � l��cran dans ARCM (qui est correcte) et ce qui s�affiche dans l�extract pdf et le d�tail de la fiche excel, o� la date de fin de chacune de ces p�riodes est identique � la date de d�but.

There is a discrepancy between the doc period / documented period which is displayed on the screen in ARCM (which is correct) and what is displayed in the extract pdf and the detail of the excel file, where the date of end of each of these periods is the same as the start date.







Brainstorm ID 8782
Created on Brainstorm 02/02/2021 05:04 AM