Conformant process flows commonly differ depending on attributes (e.g. channel, product etc.). Hence, it must be possible to set up the conformance check based on an attribute / assign multiple models to one PM project in ARIS PM.
Currently, the conformance check is useless for most of the processes.
Multiple model:
e.g. Model A for dimension value x.1 (e.g. US), while Model B is for all remaining dimension values
Combining multiple models to be used as a baseline model