Skip to Main Content
ARIS - SHARE YOUR IDEAS
How can we make ARIS better?
ADD A NEW IDEA

My ideas: Modeling & Contribution

Showing 495

Include process interfaces in EBPMN models

For better modeling experience, to include process interfaces in EBPMN models.
Maik Szmatulewicz almost 3 years ago in Modeling & Contribution 0 Open for voting

Allow role view in Connect for checking relationships/occurrences

Today, role view in Connect does not allow for checking relationships/occurrences. So, if I, e.g. select the lean view and then add roles to that view, the properties' tab "occurrences/relationships" remains empty for e.g. role objects. It says, "...
Veronika Ellermann over 1 year ago in Modeling & Contribution 0 Open for voting

Create objects in thin client also adding connections

ARIS Connect designer offers a powerful tool with "create objects". With this table upload it is possible to mass create objects while maintaining attributes. It would be great to have the capability of defining connections between the objects imp...
Philip Ueno over 1 year ago in Modeling & Contribution 0 Open for voting

Changed seeting lose from Client

Hello, From our client, every day we have to modify the default seeting of models. As you can see in the file attached, we are showing both: - default seetings - seetings modified by me. If I close the client, the client lose changed seetings.
Carlotta Vittoria Berton over 1 year ago in Modeling & Contribution 0 Open for voting

Jump feature to activities within a model or to other models.

Our modeling standards do not allow lines to cross, so it is necessary to jump, to jump to another activity with a model. Also, many times our models jump to their models. Previously we could select the jump and it would automatically go there. Ar...
Kimaya Ghag almost 2 years ago in Modeling & Contribution 0 Open for voting

Can’t have 2 connections to same box

There are times when an activity has 2 flow points to the same box to designate 2 workstreams. This is not allowed in Aris. Note: ARIS drawn lines (as opposed to connections) do not currently allow for arrow endpoints
Kimaya Ghag almost 2 years ago in Modeling & Contribution 0 Open for voting

When the pool lane name is too long it becomes three dots

There are not enough characters in the pool name, so the name disappears on the side. For BPMN & Enterprise BPMN
Kimaya Ghag almost 2 years ago in Modeling & Contribution 1 Open for voting

Swimlane names are sideways

You can't read the Role Names. The swim lanes need to be sized to the length on the name instead of minimized to save space. I think this has been requested with ARIS. Note: Instead of Sideways if it can be displayed on top left corner horizontall...
Kimaya Ghag almost 2 years ago in Modeling & Contribution 1 Open for voting

Notes & text do not attach to swimlane

Swim lanes move and change constantly. The notes don’t move with them, so they end up all over the place.
Kimaya Ghag almost 2 years ago in Modeling & Contribution 0 Open for voting

ADS configuration option: file type dependent size limit

More image files should be integrated into the processes (e.g. documentation) or mini fact sheets. To keep the required storage space in the ADS small, the size of the image files should be limited. But the size of e.g. PowerPoint files should not...
Hubert Warsitz almost 2 years ago in Modeling & Contribution 0 Open for voting