Skip to Main Content
ARIS - SHARE YOUR IDEAS
How can we make ARIS better?
ADD A NEW IDEA

Pinned ideas

View all
PINNED AI/ML features integration
like clustering, outliers detection, key influencers, predictive results with classification algorithms this would support Root-Cause-Analysis
PINNED Make all ADS document versions visible, more than one deletable at once
Currently, only the last 100 versions of a document are displayed in the ADS. We sometimes have more than 1000 versions of protocol documents. We would therefore like to be able to display all versions, 100 units are sufficient for each page. We w...

All ideas

Showing 1575

When exiting ADS document properties, the view should continue to display the ADS document in the list view

If the properties of a document are viewed via the list view in the ADS and the properties window is exited, the first document in the list is displayed as a user in the list view. See screenshot 1. It would be desirable if, after exiting the prop...
Hubert Warsitz about 2 years ago in Modeling & Contribution 0 Open for voting

Bulk submission for models into APG from ARIS Connect

Currently, modelers can only submit individual models in ARIS Connect to APG. There should be an option to submit multiple models in ARIS Connect as well.
Tim Scheer about 2 years ago in Governance Workflows 0 Open for voting

Model Overview Panel Accessibility via ARIS Connect Repository Model Editing Mode

Need to have the ability to leverage the 'Model Overview' panel in repository, model editing mode would be most useful as an aide to rapidly navigate and edit large models in ARIS connect. This feature already exists in the ARIS Architect thick cl...
Ryan Bittner about 2 years ago in Modeling & Contribution 0 Open for voting

Fix process actors in space when scrolling horizontally

Context: When building a large process model with 5+ swim lanes, it might be visually tricky to remember what lane you are on when following the process sequentially and scrolling horizontally to the right of your screen. The beginning of your pro...
Yuri Gurevich about 2 years ago in Modeling & Contribution 0 Open for voting

Name Attribute of Lane (Role Lane, Application Lane, etc..) should be able to be placed horizontally on top left as opposed to just vertically, in model type Enterprise BPMN Collaboration Diagram.

Name Attribute of Lane (Role Lane, Application Lane, etc..) should be able to be placed horizontally on top left as opposed to just vertically, in model type Enterprise BPMN Collaboration Diagram.
Kimaya Ghag about 2 years ago in Modeling & Contribution 0 Open for voting

Lock comments in Connect

Once the review of models in Connect is completed, there should be a way for ARIS admin to lock the comments (in particular ARIS DB) for further editing or removal. This will allow BPM author to reply on received comments and at the end the whole ...
T Y about 2 years ago in Modeling & Contribution 0 Open for voting

Mini workflow archiving of ADS documents

Archiving of files in ADS (see comparative document release). Creation of a standard workflow (mini workflow) that stores files in an archive group to be defined in a revision-proof manner. In German: Archivierung von Dateien im ADS (siehe Verglei...
Hubert Warsitz about 2 years ago in Governance Workflows 0 Open for voting

provide technical information for objects/symbols/connections in Connect Designer

When defining conventions with a customer in a WS we usually model some examples to come to an agreement with the customer about what should be in the filter. In Fast Track Services a predefined filter needs to be adjusted manually. So the problem...
Veronika Prueher-Pilsl about 2 years ago in Modeling & Contribution 0 Open for voting

Setting for Favorites tiles in SSC

In SSC in Home area the size for tiles in Quick Start component can be changed. As there is a component "Favorites" that shows the favorites as tiles, it would be good if the size of those tiles could be changed for that component in SSC, too.
Veronika Prueher-Pilsl about 2 years ago in Publication & Collaboration 0 Open for voting

Rollout of multiple master processes

At the moment the functionality of Rollout of master/standard processes only is done on a specific selected process. But sometimes it would be good if there was the possibility to prepare multiple processes and do a "combined" rollout of that proc...
Veronika Prueher-Pilsl about 2 years ago in Modeling & Contribution 1 Open for voting