Skip to Main Content
ARIS - SHARE YOUR IDEAS
How can we make ARIS better?
ADD A NEW IDEA

Pinned ideas

View all
PINNED Define connections using Spreadsheets
I propose to extend the functionality of spreadsheets to create connections between objects: If a connection type is allocated to a pair of columns, then this connection is created between pairs of objects in the same row of those columns. E.g. we...
PINNED Make all ADS document versions visible, more than one deletable at once
Currently, only the last 100 versions of a document are displayed in the ADS. We sometimes have more than 1000 versions of protocol documents. We would therefore like to be able to display all versions, 100 units are sufficient for each page. We w...

All ideas

Showing 1406 of 1406

Switch btw visual and code editor

When editing a calculation rule in the analysis or in the app builder, it should be possible to switch between the visual editor and the code editor.
Guest over 1 year ago in Process Mining 4 Open for voting

Properly support veto when macro runs a report

Macros can only be used in Connect Designer if they run a report (or semantic check, but veto isn't available there). In this situation vetoable macro events (e.g. 'New object is to be placed from the toolbar (vetoable)' which runs in context of M...
Rob Filor 3 months ago in Content Analysis & Reporting 0 Open for voting

Identification of the user who carries out the updates of the repository documents

It would be necessary to be able to identify the user who carries out the different updates of the documents uploaded to the repository in order to be able to keep track and to know who carries out each of the modifications or updates.
Mar Jiménez Pons 3 months ago in Modeling & Contribution 0 Open for voting

Using a second measure in charts where partitioning for criteria is used

Normally it is possible to add a second measure to a chart, like having a count or a sum on the primary axis and a time on the secondary axis. When partition for the criteria displayed in the analysis is used, it is not possible to add a second me...
Jens Nitzschke 5 months ago in Process Mining 0 Open for voting

List of predefined labels or tags that are only allowed to end-users

Currently the users may add tags to comments in entirely free way without to respect any convention. This limits the reusability and makes almost useless these user-defined tags as one difference in a character/symbol makes them separate items. It...
Trifon Yankov 5 months ago in ARIS Enterprise - Admin 0 Open for voting

Questionnaire Reviewer timer: maximum of 90 days between creation questionnaire and acceptance moment by reviewer

Our Compliancy department requires the period that it takes from initiating a DPIA (a questionnaire in ARCM) until the moment the DPO accepts the identified risks to be a maximum of 90 days. Can ARCM be adjusted so that with every questionnaire th...
Sylvia Groenbos almost 2 years ago in Risk & Compliance 2 Open for voting

Multiple sorting of tables in ARIS Connect / Viewer

Hello, currently in ARIS Connect e.g. under "Catalog" only one column can be filtered by one attribute (See attachment). It would be of great advantage if it would be possible to sort tables by multiple attributes via the XML customizing of a layo...
Sören Schmitt about 1 year ago in Publication & Collaboration 0 Open for voting

Catalog - Enable custom filter for specific catalog columns

Today we only have the possibility to filter a catalog column for a specific item by entering filter criteria (text) or for the name attribute it is possible to filter by text and by character (A-Z 0-9). It is required to define specific filter c...
Welf-Holger Prietzsch about 1 year ago in Publication & Collaboration 0 Open for voting

Export of Dashboard graphics

At the moment it is possible to export the data of a dashboard as a CSV file. It would be good if it was possible to export the data and the dashboard graphic into e.g. an xls file, maybe using a report.
Veronika Prueher-Pilsl over 2 years ago in Dashboarding 1 Open for voting

Maintenance Window

For large EMS customer is required to inform the user via an "in maintenance" screen that the ARIS Connect portal is starting up/not available or in maintenance mode. The reason for maintenance and also the expected time of system availability sho...
Richard Verhoef over 2 years ago in Technical Administration 0 Open for voting