Skip to Main Content
ARIS - SHARE YOUR IDEAS
How can we make ARIS better?
ADD A NEW IDEA

Pinned ideas

PINNED AI/ML features integration
like clustering, outliers detection, key influencers, predictive results with classification algorithms this would support Root-Cause-Analysis

Process Mining

Showing 191

New component: Image

help on building a good corporate look and feel
Julian Krumeich about 3 years ago in Process Mining 0 Planned

Interface Arabic Language Support

It only seems logical given that the rest of the ARIS interfaces do support Arabic.
Sadiq Al Shara 9 months ago in Process Mining 0 Open for voting

Connection Duration Histogram Preview in Process Explorer

Objective: To enhance the process explorer in the process mining tool by providing a preview of the connection duration distribution when a user clicks on the connection between two activities. This feature aims to give better visibility into the ...
Tim Knechtel 3 months ago in Process Mining 0 Open for voting

Central user project/data set authorization

Currently (SR25) user authorizations (view/edit/delete/set privilege) have to be set on a per project/data set basis. When maintaining many projects/data sets it can be quite cumbersome to add or make changes in these authorization settings. In ad...
Roland van de Ruit 6 months ago in Process Mining 0 Open for voting

Switch btw visual and code editor

When editing a calculation rule in the analysis or in the app builder, it should be possible to switch between the visual editor and the code editor.
Guest about 2 years ago in Process Mining 4 Open for voting

Case wait time (cases with activity end timestamps)

One powerful analysis measure that does not currently appear to be available out of the box is 'Case Wait Time' for cases with activity start and end timestamps. Expressed simply, this is the amount of time that elapses during the overall duration...
Paul Fenton 10 months ago in Process Mining 0 Open for voting

Insertion of weblinks to applications, e.g. SAP base URL + corresponding parameters out of the process mining data to jump to the connected case

Insertion of weblinks to applications, e.g. SAP base URL + corresponding parameters out of the process mining data to jump to the connected case. The link should be accessible in the analysis, e.g. in a case list per case callable. With this link ...
Jens Nitzschke almost 2 years ago in Process Mining 1 Open for voting

Unexpected conformance warning message/guidance

Currently, when there are tasks in the reference process that do not appear in the data set activities, these have to be marked as disregarded. This can potentially lead to cases being marked as conformant when in reality they are not - for instan...
Paul Fenton 7 months ago in Process Mining 0 Open for voting

Indication which of the extracted tables and columns are already in use

By indicating which of the extracted tables and columns are already in use (e.g., in transformations), users would get a good indication of whether there is unconsidered data in APM that might contain useful information for analysis.
Christoph Kempf about 1 year ago in Process Mining 0 Open for voting

Assign manual colors to values + consistent colors

Feature Description The capability to assign colors to individual dimensional values. E.g Spain = Yellow, Belgium = Green, Germany = Blue, etc Also color assignments should remain consistent when analyzing. Reason Certain customers want to have a ...
Roland van de Ruit over 4 years ago in Process Mining 0 Open for voting